Design Control
Drawing packages, submittals, samples, mock-ups and RFIs through consultant → PMO → operator → owner review.
Executive question
Which design packages are holding up sign-off?
6 packages in circulation. 3 are with reviewers beyond the standard 10-working-day window and risk delaying tender.
AI InsightThe Guestroom Interiors package (Rev C) is the highest-leverage submittal — its approval releases four downstream FF&E procurement scopes.
In review
3
Watch
Approved
1
Healthy
Rejected
0
Act now
| Package | Type | Discipline | Rev | Submitted by | Reviewer | Due | Status | Latest comment |
|---|---|---|---|---|---|---|---|---|
| Guestroom Interiors Package Rev C DP-101 | Drawing | Interiors | C | ID Consultant | Operator Design | 2027-08-14 | Under Review | Awaiting operator brand comments |
| Lobby Lighting Sample Board DP-102 | Sample | Interiors | A | Lighting Consultant | PMO | 2027-07-01 | Approved | Approved with note on Kelvin range |
| Life Safety Strategy Report DP-103 | Submittal | MEP | B | MEP | AHJ | 2027-09-05 | Issued | Submitted for authority review |
| RFI-088 Ballroom Column Grid DP-104 | RFI | Structure | - | Contractor | Architect | 2027-07-25 | Under Review | Studying alternate grid impact |
| Guestroom Full Mock-up Inspection DP-105 | Mock-up | Interiors | 1 | Contractor | Operator | 2027-10-20 | Draft | Scheduling inspection with operator |
| F&B Concept Narrative DP-106 | Brief | F&B | B | F&B Consultant | Owner | 2027-08-30 | Under Review | Owner requesting menu direction |